logo

PLTA Poso

Sector: Commercial • Location: Central Sulawesi, Indonesia

Source: World Bank Group

Project
Active

PT Poso Energy signed a 30-year power purchase agreement (PPA) with the state-owned electricity utility, PT PLN, in October 2007. PLTA Poso II was deveoped as a greenfield, build-own-operate (BOO) project. The 195 MW (3 X 65 MW) project was located in the village of Sulewana, near the town of Poso in Central Sulawesi province.

The sponsors of the project were PT Hadji Kalla, a unit of the Kall

Status
Prospective
Sector
Commercial, Hydro, Power Transmission, Power Generation (CCGT), Government
Location
Central Sulawesi, Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about PLTA Poso

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “PLTA Poso” is an infrastructure initiative in the Commercial sector, located in Central Sulawesi, Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

PT Poso Energy signed a 30-year power purchase agreement (PPA) with the state-owned electricity utility, PT PLN, in October 2007. PLTA Poso II was deveoped as a greenfield, build-own-operate (BOO) project. The 195 MW (3 X 65 MW) project was located in the village of Sulewana, near the town of Poso in Central Sulawesi province. The sponsors of the project were PT Hadji Kalla, a unit of the Kalla Group, and PT Bukaka Hydropower Engineering and Consulting Company, a unit of the Bukaka Group. The sponsors’ exact equity shares in the project were not available from public sources as of December 2008. The project reached financial closure in May 2008, with the signing of a US$134 million (1.3 trillion Indonesian rupiah [IDR]) loan facility between PT Poso Energy and a syndicate comprised of PT Bank Negara Indonesia Tbk, BRI, Bank Panin and Bank Bukopin. The eight-year loan facility comprised a IDR662.3 billion (US$68 million) local currency-denominated tranche and a US$66 million dollar-denominated tranche. As of May 2008, 30% of the project’s construction had been completed. The project was expected to commence commercial operations by the end of 2010. The project was commissioned in December 2012, although the transmission lines were not completed yet. Delays in the project were caused by "unbalanced soil conditions and concerns on the security conditions in Poso". IDR loan commitments were converted into USD using the IDR/USD annual average exchange rate for 2008 (US$1 = IDR9698.96), obtained from IMF IFS.

Original sector

Energy

Budget

Location

Country

Indonesia

State

Central Sulawesi

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Hydro, Power Transmission, Power Generation (CCGT), Government

Article published date

2024-05-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project