PLTSa Waste-to-Energy Power Plant at Cipeucang
Near operation start · Banten · Last reported Jun 2025
Source: Magz TEMPO
The PLTSa waste-to-energy power plant project at the final processing site (TPA) in Cipeucang, South Tangerang, Banten, aims to process 1,100 tons of waste per day. It is part of a government plan to build similar facilities in 33 other locations to address waste management through waste-to-energy technology.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Waste Processing and Treatment, Government
- Location
- South Tangerang, Banten, Indonesia
- Updated
- 22 Jul 2026
- Source
- Magz TEMPO
ConstructChat
Ask ConstructChat about PLTSa Waste-to-Energy Power Plant at Cipeucang
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | near operation start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The PLTSa waste-to-energy power plant project at the final processing site (TPA) in Cipeucang, South Tangerang, Banten, aims to process 1,100 tons of waste per day. It is part of a government plan to build similar facilities in 33 other locations to address waste management through waste-to-energy technology. |
Original sector | Energy |
Location
Country | Indonesia |
State | Banten |
City | South Tangerang |
Source
Source | Magz TEMPO |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Waste Processing and Treatment, Government |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
