Plugplay gasification plant for onsite conversion of otherwise unusable waste into renewable energy

Sector: Nuclear • Location: Italy

Source: EU Funding & Tenders Portal

Project
Ended

Typical gasification processes’ design, control and capital investment make it profitable only for medium-large scale with important throughput (plant > 1 GWh per year of electricity, with investment costs > 1M€). This falls well beyond the needs of the medium standard industrial consumption band, with annual electricity consumption between 500 and 2,000 MWh, i.e 3-4 orders of magnitude lower. H

Project Information FAQ

Project Information

3 Q
The project “Plugplay gasification plant for onsite conversion of otherwise unusable waste into renewable energy” is an infrastructure initiative in the Nuclear sector, located in Italy. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Typical gasification processes’ design, control and capital investment make it profitable only for medium-large scale with important throughput (plant > 1 GWh per year of electricity, with investment costs > 1M€). This falls well beyond the needs of the medium standard industrial consumption band, with annual electricity consumption between 500 and 2,000 MWh, i.e 3-4 orders of magnitude lower. Hysytech is positioned at this market gap. Synergy technology represents a novel turn-key product for the conversion of by-products from industry into fuel gas (syngas) through gasification. Synergy can be easily adapted as part of the production process of industrial manufacturing plants, with a treatment capacity of 100 kg per hour, generating 800 MWh per year of electricity and 600 MWh of useful heat. One of the biggest advantages of Synergy is making gasification affordable and profitable for small volume plants to be installed at manufacturing sites without the need of modifying the usual process or hiring new specialised operators. The selling price of Synergy gasification plant is estimated at €400 k including the installation of a fully ready-to-operate plant. This makes gasification an affordable and profitable investment for a medium industrial site, with a payback period of 2 to 5 years. This new technology has been developed after a preliminary assessment of some business opportunities on the field. The result is an existing prototype plant (processing 10kg/h) with the improved design of the complete plant, including the fluid bed reactor and gas clean-up system. Funded in 2003, Hysytech is today a pioneer in the field of process engineering and, in particular, in the design and construction of turn-key plants for fuel chemical processing, energy production and environmental treatment with its processes installed in more than 450 industrial sites. The Synergy project is a natural continuation of its experience and capability.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data