PLUMBING 12 Channel ST
Sector: Water Supply and Storage • Location: Boston, Massachusetts, United States of America
Source: City of Boston
install kitchen sink, point of use 120v water heater, pump for drainage. Plumb water into office space, rough out water pipes Connect drain to pump to discharge kitchen sink into 2” cast iron floor drain on the horizontal located in hallway, connect vent from pump to floor drain vent
- Status
- Prospective
- Sector
- Water Supply and Storage, Metal, Residential, Commercial, Government, Steel, Waste Processing and Treatment
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about PLUMBING 12 Channel ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | install kitchen sink, point of use 120v water heater, pump for drainage. Plumb water into office space, rough out water pipes Connect drain to pump to discharge kitchen sink into 2” cast iron floor drain on the horizontal located in hallway, connect vent from pump to floor drain vent |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Residential, Commercial, Government, Steel, Waste Processing and Treatment |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
