PLUMBING 12 Thwing ST
Open · Massachusetts
Source: City of Boston
Provide all rough and finish plumbing with Schedule 40 PVC for drains, waste, and vents, PEX for potable water piping and copper stubouts and copper shower valve piping. Install of all plumbing fixtures and valves. Install of all plumbing appliances with contractor assist.
- Status
- Prospective
- Sector
- Water Supply and Storage, Metal, Commercial, Government
- Location
- Roxbury, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about PLUMBING 12 Thwing ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Provide all rough and finish plumbing with Schedule 40 PVC for drains, waste, and vents, PEX for potable water piping and copper stubouts and copper shower valve piping. Install of all plumbing fixtures and valves. Install of all plumbing appliances with contractor assist. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Roxbury |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
