PLUMBING 261 Temple ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Install one new backflow preventer cross connection device for boiler installation. Install one new 40 gallon stainless steel indirect gas fired water heater to replace existing in same location, connecting to new boiler and existing domestic hot water piping.
- Status
- Prospective
- Sector
- Water Supply and Storage, Steel, Commercial, Government, Metal
- Location
- West Roxbury, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about PLUMBING 261 Temple ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Install one new backflow preventer cross connection device for boiler installation. Install one new 40 gallon stainless steel indirect gas fired water heater to replace existing in same location, connecting to new boiler and existing domestic hot water piping. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | West Roxbury |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Commercial, Government, Metal |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
