PLUMBING 6 Reddy AV
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
install toilet, shower, lav on the 3rd floor. install toilet, lav, tub on the 2nd floor. install washing machine, kitchen sink, garbage disposal, dishwasher, toilet, lav on the first floor. install water heater and cross connection device in the basement.
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Government
- Location
- Hyde Park, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about PLUMBING 6 Reddy AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | install toilet, shower, lav on the 3rd floor. install toilet, lav, tub on the 2nd floor. install washing machine, kitchen sink, garbage disposal, dishwasher, toilet, lav on the first floor. install water heater and cross connection device in the basement. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Hyde Park |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
