Plumbing FOREST AVENUE
Sector: Water Supply and Storage • Location: STATEN ISLAND, New York City, New York, USA
Source: City of New York
Install two HC water closets, run new water lines form meter to the fixtures, new sanitary lines. Cap off gas lines to existing 4 roof top units, replace the old gas lines with new, & reconnect the gas lines after the replacement of the roof top units.
- Status
- Prospective
- Sector
- Water Supply and Storage, Road
- Location
- New York City, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- City of New York
ConstructChat
Ask ConstructChat about Plumbing FOREST AVENUE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Install two HC water closets, run new water lines form meter to the fixtures, new sanitary lines. Cap off gas lines to existing 4 roof top units, replace the old gas lines with new, & reconnect the gas lines after the replacement of the roof top units. |
Location
Country | United States of America (USA) |
State | New York |
City | New York City |
Source
Source | City of New York |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
