Plymouth Zachary WTP Enhancements
Sector: Water Supply and Storage • Location: Minneapolis, Minnesota, United States of America
Source: Dodge USA
Plymouth Zachary WTP Enhancements The City of Plymouth, Minnesota (Owner) owns and operates the Zachary Water Treatment Plant (WTP) with an approximate maximum capacity of 17 million of gallons per day (MGD). The Project will generally consist of the addition of plate settler equipment to the current Zachary WTP to improve backwash reclaim operations as well as numerous HVAC and electrical upgrade
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Power Generation (CCGT), Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)
- Location
- Minneapolis, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Plymouth Zachary WTP Enhancements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Plymouth Zachary WTP Enhancements The City of Plymouth, Minnesota (Owner) owns and operates the Zachary Water Treatment Plant (WTP) with an approximate maximum capacity of 17 million of gallons per day (MGD). The Project will generally consist of the addition of plate settler equipment to the current Zachary WTP to improve backwash reclaim operations as well as numerous HVAC and electrical upgrades throughout the existing WTP. The Project generally consists of the following primary components... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Minneapolis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Power Generation (CCGT), Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial) |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
