PMOC Dispatch Remodel
Sector: Manufacturing (Industrial) • Location: Loveland, Colorado, United States of America
Source: Dodge
PMOC Dispatch Remodel - principal components of work include the following: 1. The Contractor shall conduct all necessary demolition to prepare the work area for construction. 2. The Contractor shall remodel the existing Dispatch Kitchen and Operators lounge. 3. The Contractor shall remodel the existing operator s restroom including relocating the entry door to the east side of the restroom. 4. Th
- Status
- Closed
- Sector
- Manufacturing (Industrial), Residential, Commercial
- Location
- Loveland, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about PMOC Dispatch Remodel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PMOC Dispatch Remodel - principal components of work include the following: 1. The Contractor shall conduct all necessary demolition to prepare the work area for construction. 2. The Contractor shall remodel the existing Dispatch Kitchen and Operators lounge. 3. The Contractor shall remodel the existing operator s restroom including relocating the entry door to the east side of the restroom. 4. The Contractor shall remodel the existing Men s and Women s restrooms in the basement hallway. 5. T... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Loveland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Commercial |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
