logo

Podvelezje wind farm

Sector: Power Generation (CCGT) • Location: Bosnia and Herzegovina

Source: KFW Bank aus Verantwortung

Project
Active

The FC measure envisages the construction of a wind farm at the Podvele site near the city of Mostar in Bosnia and Herzegovina (BiH). It is planned to build up to 16 wind turbines with an output of 2 - 2.5 MW each and connect them to the Bosnian interconnected grid. The total installed capacity of the wind farm will be 32 - 40 MW, and the annual electricity generation will be around 86 GWh. The ai

Project Information FAQ

Project Information

5 Q
The project “Podvelezje wind farm” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Bosnia and Herzegovina. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The FC measure envisages the construction of a wind farm at the Podvele site near the city of Mostar in Bosnia and Herzegovina (BiH). It is planned to build up to 16 wind turbines with an output of 2 - 2.5 MW each and connect them to the Bosnian interconnected grid. The total installed capacity of the wind farm will be 32 - 40 MW, and the annual electricity generation will be around 86 GWh. The aim of the FC measure is to expand and diversify the country's electricity supply sources and to feed more climate-friendly electricity into the Bosnian interconnected grid. This should contribute to sustainable economic growth in BiH and to global climate protection. The target group of the FC measure is the entire population of BiH connected to the electricity grid. The borrower is the Republic of BiH. The project sponsor is the public company Elektroprivreda Bosne i Hercegovine based in Sarajevo (EP BiH).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data