Point Baker Water System Addition
One of 10,000+ projects Taiyo tracks in Florida.
Source: ArcGIS StoryMaps
This 1.79-acre lot zoned AG-RR (Agriculture Rural Residential) is a Public Utility Facility project to construct an addition to the existing building. This 1,000 sq. ft. metal building addition will host office space and a conference area. The addition was included in the building plan since original approval with foundation already in place.
- Status
- Prospective
- Sector
- Water Supply and Storage, Metal, Raw Materials, Commercial, Power Transmission, Power Generation (CCGT), Residential
- Location
- Milton, Florida, United States of America
- Updated
- 19 Nov 2026
- Source
- ArcGIS StoryMaps
ConstructChat
Ask ConstructChat about Point Baker Water System Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This 1.79-acre lot zoned AG-RR (Agriculture Rural Residential) is a Public Utility Facility project to construct an addition to the existing building. This 1,000 sq. ft. metal building addition will host office space and a conference area. The addition was included in the building plan since original approval with foundation already in place. |
Original sector | Infrastructure |
Location
Country | United States of America (USA) |
State | Florida |
City | Milton |
Source
Source | ArcGIS StoryMaps |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Raw Materials, Commercial, Power Transmission, Power Generation (CCGT), Residential |
Article published date | 2026-07-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States
- Shaw Air Force Base
- Kings Bay Naval Submarine Base
- Beaumont Refinery Expansion, Texas
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Bayou Bridge Pipeline Project, Louisiana
- Texas LNG’s New Liquefied Natural Gas Facility, Brownsville, Texas
- Trunkline LNG Lake Charles Terminal, Louisiana
