Point Mackenzie Road MP 0-7 Rehabilitation Phase 1
Sector: Water Supply and Storage • Location: Point Mackenzie, Alaska, United States of America
Source: Dodge USA
The Matanuska-Susitna Borough is requesting bids from qualified contractors to reconstruct the roadway to provide more reliable access along Point Mackenzie Road. This project will involve, but is not limited to clearing and grubbing, excavation, installation of drainage culverts import and placement of borrow, import and placement of surface course, paving, placing topsoil and seed, and installin
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Mass Transit, Government, Rail, Commercial
- Location
- Point Mackenzie, Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Point Mackenzie Road MP 0-7 Rehabilitation Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Matanuska-Susitna Borough is requesting bids from qualified contractors to reconstruct the roadway to provide more reliable access along Point Mackenzie Road. This project will involve, but is not limited to clearing and grubbing, excavation, installation of drainage culverts import and placement of borrow, import and placement of surface course, paving, placing topsoil and seed, and installing signs and pavement markings in locations specified in the plans and specifications. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Point Mackenzie |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Mass Transit, Government, Rail, Commercial |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
