Pointe de Rivière-du-Loup Maritime Park
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The project consists of a redevelopment of the wharf area, in particular by construction of a multiservice reception building, as well as land and maritime facilities The project includes the following: Construction of a 1,651 m2 reception building including: -A tourist information center, sanitary blocks, Administrative offices and reception desks for different partners; -A multifunctional imme
- Status
- Prospective
- Sector
- Water Supply and Storage, Hotel, Seaport, Oil and Gas, Car parking, Commercial, Government, Automotive
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Pointe de Rivière-du-Loup Maritime Park
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of a redevelopment of the wharf area, in particular by construction of a multiservice reception building, as well as land and maritime facilities The project includes the following: Construction of a 1,651 m2 reception building including: -A tourist information center, sanitary blocks, Administrative offices and reception desks for different partners; -A multifunctional immersive museum room on history, the site and the riches of the St. Lawrence; Redevelopment of traffic circuits and parking lots; Development of a walk on the wharf with trailsand pedestrian walkways. The wharf will be reinforced by a central paving, two sidewalks and lighting suitable for evening use; Cruising area with sundecks and secondary buildings Including a sanitary block. An area of nautical functions (small garage for repairs and works) will be located near the water. The development of green and recreational areas is also planned; Demolition and replacement of the infrastructure Marina with work to enlarge the basin to increase the capacity (from 32 to 58 berths, of which 26 exclusively for tourism), upgrading and modernization of facilities electrical equipment, acquisition and installation of equipment required for Wastewater, black water and oil services |
Original sector | Community, Culture and Recreation |
Location
Country | Canada |
State | Quebec |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hotel, Seaport, Oil and Gas, Car parking, Commercial, Government, Automotive |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
