logo

Poison Lake Shalas Combine Project on State Route 44 in Lassen County

Sector: Automotive • Location: Lassen County, California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Ongoing

The Poison Lake Shalas Combine project in Lassen County is on State Route (SR) 44 about nine miles east of Old Station from the Shasta County line to SR 36. The purpose of the project is to restore the facility to a state of good repair such that the roadway will be in a condition requiring minimal maintenance, and to improve safety/ roadway geometrics. This project will realign the existing highw

Project Information FAQ

Project Information

5 Q
The project “Poison Lake Shalas Combine Project on State Route 44 in Lassen County” is an infrastructure initiative in the Automotive sector, located in Lassen County, California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Poison Lake Shalas Combine project in Lassen County is on State Route (SR) 44 about nine miles east of Old Station from the Shasta County line to SR 36. The purpose of the project is to restore the facility to a state of good repair such that the roadway will be in a condition requiring minimal maintenance, and to improve safety/ roadway geometrics. This project will realign the existing highway to improve geometrics, superelevation, and increase the clear recovery zone for vehicles. This project includes earthwork, paving and drainage improvements. The project also includes a Capital Preventative Maintenance (CAPM) pavement strategy on SR 44 from postmile 0.0 to 37.2. The scope of the project includes 0.2’ overlay through the length of the project, paving of four maintenance vehicle pullouts, reconstruction of railroad approaches, replacing 16 drainage systems, upgrading guardrail, installing 45 guide signs, and replacing Census Elements while upgrading and relocating CCTV.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data