POKLECANI WIND FARM
One of 1,462 projects Taiyo tracks in Bosnia and Herzegovina.
Source: European Investment Bank (EIB)
The project concerns the design, construction and operation of an onshore windfarm with total installed capacity of 132 MW, located in the wider mountainous area in the West Herzegovina-Canton in the Municipality of Posusje.
- Status
- Under Construction
- Sector
- Wind, Raw Materials
- Location
- Bosnia and Herzegovina
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about POKLECANI WIND FARM
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project concerns the design, construction and operation of an onshore windfarm with total installed capacity of 132 MW, located in the wider mountainous area in the West Herzegovina-Canton in the Municipality of Posusje. |
Original sector | Energy |
Location
Country | Bosnia and Herzegovina |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials |
Article published date | 2026-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
