logo
ProjectSigned

POKLECANI WIND FARM

One of 1,462 projects Taiyo tracks in Bosnia and Herzegovina.

Source: European Investment Bank (EIB)

The project concerns the design, construction and operation of an onshore windfarm with total installed capacity of 132 MW, located in the wider mountainous area in the West Herzegovina-Canton in the Municipality of Posusje.

Status
Under Construction
Sector
Wind, Raw Materials
Location
Bosnia and Herzegovina
Updated
22 Jul 2026
Source
European Investment Bank (EIB)

ConstructChat

Ask ConstructChat about POKLECANI WIND FARM

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “POKLECANI WIND FARM” is an infrastructure initiative in the Wind sector, located in Bosnia and Herzegovina. Taiyo aggregates data on it from European Investment Bank (EIB).

Participants

Not available for this record.

Status

Original status

signed

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project concerns the design, construction and operation of an onshore windfarm with total installed capacity of 132 MW, located in the wider mountainous area in the West Herzegovina-Canton in the Municipality of Posusje.

Original sector

Energy

Location

Country

Bosnia and Herzegovina

Source

Source

European Investment Bank (EIB)

URL

More Details

Record type

Project

Sector

Wind, Raw Materials

Article published date

2026-06-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project