Poland's First Nuclear Power Plant
Sector: Nuclear • Location: Poland
Source: Polska Agencja Prasowa SA
Poland has signed an Engineering Development Agreement (EDA) for the construction of its first nuclear power plant with the Westinghouse-Bechtel consortium. This agreement establishes a framework for cooperation and ensures that design work will proceed as scheduled, including securing necessary permits and conducting geological studies.
- Status
- Prospective
- Sector
- Nuclear, Power Generation (CCGT), Government
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- Polska Agencja Prasowa SA
ConstructChat
Ask ConstructChat about Poland's First Nuclear Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Poland has signed an Engineering Development Agreement (EDA) for the construction of its first nuclear power plant with the Westinghouse-Bechtel consortium. This agreement establishes a framework for cooperation and ensures that design work will proceed as scheduled, including securing necessary permits and conducting geological studies. |
Original sector | Energy |
Location
Country | Poland |
Source
Source | Polska Agencja Prasowa SA |
URL |
More Details
Record type | Project |
Sector | Nuclear, Power Generation (CCGT), Government |
Article published date | 2025-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
