Polaniec Biomass Powerplant
One of 10,000+ projects Taiyo tracks in Poland.
Source: European Investment Bank (EIB)
The project concerns the replacement of a coal-fired boiler in an existing power plant in Poland with a new fluidised-bed boiler designed to combust 100% biomass. The existing steam turbine and generator will be refurbished and allow the production of around 200 MWe.
- Status
- Under Construction
- Sector
- Wind, Power Generation (CCGT), Biomass, Power Transmission, Government
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about Polaniec Biomass Powerplant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | <p>The project concerns the replacement of a coal-fired boiler in an existing power plant in Poland with a new fluidised-bed boiler designed to combust 100% biomass. The existing steam turbine and generator will be refurbished and allow the production of around 200 MWe.</p> |
Original sector | Energy |
Location
Country | Poland |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Biomass, Power Transmission, Government |
Article published date | 2025-08-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
