Polar Semiconductor Manufacturing (Alterations/Renovation)
Construction · Minnesota · Last reported Sep 2024
Source: Dodge USA
build out of existing space - renovation of existing space/interior remodel of existing buildings P1, P2, and P3 and a 3,750 square foot electrical room addition between buildings P2 and P3
- Status
- Under Construction
- Sector
- Advanced Electronics, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Bloomington, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Polar Semiconductor Manufacturing (Alterations/Renovation)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | build out of existing space - renovation of existing space/interior remodel of existing buildings P1, P2, and P3 and a 3,750 square foot electrical room addition between buildings P2 and P3 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Bloomington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Advanced Electronics, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
