Polaris Geothermal Power Plant Phases I + II

Active · Managua

Source: World Bank Group

Project
Active

In January 2010, Polaris Energy Nicaragua S.A. (PENSA), a subsidiary of Ram Power Co [USA] began development of a two phase geo thermal power plant, near San Jacinto, Nicaragua. Each phase of the project would add 36MW of capacity to the project. PENSA had a 20-year PPA with DISNORTE and DISSUR, the local, privatized power distributors owned by Union Fenosa, now Gas Natural Fenosa.

The project re

Status
Prospective
Sector
Geothermal, Natural Gas, Power Generation (CCGT), Government, Commercial
Location
Managua, Nicaragua
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Polaris Geothermal Power Plant Phases I + II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Polaris Geothermal Power Plant Phases I + II” is an infrastructure initiative in the Geothermal sector, located in Managua, Nicaragua. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In January 2010, Polaris Energy Nicaragua S.A. (PENSA), a subsidiary of Ram Power Co [USA] began development of a two phase geo thermal power plant, near San Jacinto, Nicaragua. Each phase of the project would add 36MW of capacity to the project. PENSA had a 20-year PPA with DISNORTE and DISSUR, the local, privatized power distributors owned by Union Fenosa, now Gas Natural Fenosa. The project reached financial closure for both phases in 2010. The first phase totaled US $180 million. It was financed by CABEI as well as several bi-lateral banks in January 2010 and included a $70 million senior credit facility as well as a subordinated tranche of US $7 million. The second phase cost US $190 million and financing was arranged by the IFC in November 2010. The financing included senior construction and term loans for US $140 million and US $20 million in subordinated debt. The IADB contributed a US $40 million loan as part of the financing and the IFC directly contributed a senior loan of US $30.3 million and a quasi loan of US $20 million. The operations of Polaris Phase II commenced in 2012. . The US$77m package splits into an11-year US$70m senior facility (US$20m each from CABEI, EDC and FMO, withUS$10m from Cordiant under a CABEI B tranche) and a 12-year US$7msubordinated loan from FMO. Total project cost was US$149m. The financing, arranged by the International Finance Corp, which is part of the World Bank Group, includes senior construction and term loans for USD 140 million and USD 20 million in subordinated debt.

Original sector

Energy

Budget

Location

Country

Nicaragua

State

Managua

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Geothermal, Natural Gas, Power Generation (CCGT), Government, Commercial

Article published date

2024-05-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project