logo

Polat Samurlu Wind Farm

Sector: Wind • Location: Turkey

Source: World Bank Group

Project
Active

Dogal Enerji was planning the development of the 30 MW Samurlu wind farm, Aliaga, Izmir province. The project was to comprise 15 turbines of 2 MW, producing 75 GWh annually. Dogal Enerji was a subsidiary of Turkish Polat Enerji. Polat Enerji was 50% owned by French EDF Energies Nouvelles and entrepreneur Adnan Polat. Polat Enerji spanned four wind energy related SPVs: Dogal Energy, Soma Energy, Po

Project Information FAQ

Project Information

5 Q
The project “Polat Samurlu Wind Farm” is an infrastructure initiative in the Wind sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Dogal Enerji was planning the development of the 30 MW Samurlu wind farm, Aliaga, Izmir province. The project was to comprise 15 turbines of 2 MW, producing 75 GWh annually. Dogal Enerji was a subsidiary of Turkish Polat Enerji. Polat Enerji was 50% owned by French EDF Energies Nouvelles and entrepreneur Adnan Polat. Polat Enerji spanned four wind energy related SPVs: Dogal Energy, Soma Energy, Poyraz Energy and Doruk Energy. Annual output was estimated at 90 GWh. Commissioning was expected for 2012. The developer received a 49 year production license in December 2007, amended in October 2008. German Enercon was to supply the equipment. The project was reported as operated by EDF-EN. In 2013, Polat Enerji still reported the project as expecting to be commissioned in 2012. No further information was avialable. Total project cost was estimated at EUR 37 million. http://www.polatenerji.com/eng/f_samurlu.php

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data