logo

Polat Seyitali-Aliaga wind farm

Sector: Raw Materials • Location: Turkey

Source: World Bank Group

Project
Active

Doruk Enerji was planning the development of the 30 MW Seyitali-Aliaga wind farm, near Izmir province. The project was desigend to comprise 15 turbines of 2 MW. Doruk Enerji was 50-50 owned by Demirir Enerji and Polat Enerji. Polat Enerji was 50% owned by French EDF EN. Annual output was 95 GWh.

The project was commissioned in July 2011. Equipment was supplied by Enercon from Germany. As of Octob

Project Information FAQ

Project Information

5 Q
The project “Polat Seyitali-Aliaga wind farm” is an infrastructure initiative in the Raw Materials sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Doruk Enerji was planning the development of the 30 MW Seyitali-Aliaga wind farm, near Izmir province. The project was desigend to comprise 15 turbines of 2 MW. Doruk Enerji was 50-50 owned by Demirir Enerji and Polat Enerji. Polat Enerji was 50% owned by French EDF EN. Annual output was 95 GWh. The project was commissioned in July 2011. Equipment was supplied by Enercon from Germany. As of October 2011, no further details about permits and contracts were available. As of October 2011, no information was available on total investment costs. It was reported in December 2010 however that BayerenLB was providing export financing totalling EUR26 million ($35.6 million) towards the equipment supply contract. The 16-year debt tenor for German wind turbine manufacturer Enercon had a 95% Hermes cover. It was to fund the delivery costs of the projects 15 wind turbines. Lacking more information, total cost of $35.6 million was adopted. http://www.polatenerji.com/eng/f_seyitali.php

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data