logo

Polat Seyitali-Aliaga wind farm

Sector: Manufacturing (Industrial) • Location: Turkey

Source: World Bank Group

Project
Active

Doruk Enerji was planning the development of the 30 MW Seyitali-Aliaga wind farm, near Izmir province. The project was desigend to comprise 15 turbines of 2 MW. Doruk Enerji was 50-50 owned by Demirir Enerji and Polat Enerji. Polat Enerji was 50% owned by French EDF EN. Annual output was 95 GWh.

The project was commissioned in July 2011. Equipment was supplied by Enercon from Germany. As of Octob

Status
Prospective
Sector
Manufacturing (Industrial), Wind, Power Generation (CCGT), Raw Materials, Commercial, Government
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Polat Seyitali-Aliaga wind farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Polat Seyitali-Aliaga wind farm” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Doruk Enerji was planning the development of the 30 MW Seyitali-Aliaga wind farm, near Izmir province. The project was desigend to comprise 15 turbines of 2 MW. Doruk Enerji was 50-50 owned by Demirir Enerji and Polat Enerji. Polat Enerji was 50% owned by French EDF EN. Annual output was 95 GWh. The project was commissioned in July 2011. Equipment was supplied by Enercon from Germany. As of October 2011, no further details about permits and contracts were available. As of October 2011, no information was available on total investment costs. It was reported in December 2010 however that BayerenLB was providing export financing totalling EUR26 million ($35.6 million) towards the equipment supply contract. The 16-year debt tenor for German wind turbine manufacturer Enercon had a 95% Hermes cover. It was to fund the delivery costs of the projects 15 wind turbines. Lacking more information, total cost of $35.6 million was adopted. http://www.polatenerji.com/eng/f_seyitali.php

Original sector

Energy

Budget

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Wind, Power Generation (CCGT), Raw Materials, Commercial, Government

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project