logo

Polat Soma II Wind Farm

Sector: Wind • Location: Turkey

Source: World Bank Group

Project
Active

Soma Enerji was planning the development of the 61.6 MW Soma II wind farm, Manisa province. The project was to comprise 77 turbines of 0.8 MW. Soma II was an addition to the 79.2 MW Soma I wind farm, comprising 99 turbines of 0.8 MW and commissioned in November 2010. Soma Enerji was a wholly-owned subsidiary of Polat Enerji. Polat Enerji was 50% owned by French EF Energies Nouvelles, and entrepren

Project Information FAQ

Project Information

5 Q
The project “Polat Soma II Wind Farm” is an infrastructure initiative in the Wind sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Soma Enerji was planning the development of the 61.6 MW Soma II wind farm, Manisa province. The project was to comprise 77 turbines of 0.8 MW. Soma II was an addition to the 79.2 MW Soma I wind farm, comprising 99 turbines of 0.8 MW and commissioned in November 2010. Soma Enerji was a wholly-owned subsidiary of Polat Enerji. Polat Enerji was 50% owned by French EF Energies Nouvelles, and entrepreneur Adnan Polat. Annual output for the whole farm was estimated at 405 GWh. Commissioning was expected in early-2012. Commissioning was realized in January 2012. Equipment was to be supplied by German Enercon. Financial close was reached in February 2011.Construction started in February 2011. The project leased 1.150.000 m2 from the Ministry of Forestry. The project was divided in EUR62.45 million ($83 million) debt and EUR10.45 million ($13.9 million) equity. The debt included a EUR58.45 million ($77.7 million) 14 year term loan and a EUR4 million ($5.3 million) 1 year revolving credit, arranged by Garanti bank. There was a 2 year grace period. Total project costs were thus EUR72.90 million ($97 million). http://www.polatenerji.com/eng/f_soma.php

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data