logo
ProjectNotice To Proceed

Polavaram Irrigation Project

Sector: Cement • Location: Polavaram, Andhra Pradesh, India

Source: India Investment Grid (IIG)

Information Water Resources-AP has come up with Polavaram Irrigation Project with a ticket size of 55548.87 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Polavaram Project is a multi-purpose project which has been accorded National Project status

Status
Closed
Sector
Cement, Hydro, Tunnel, Water Supply and Storage, Government, Power Generation (CCGT), Road
Location
Polavaram, Andhra Pradesh, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Polavaram Irrigation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Polavaram Irrigation Project” is an infrastructure initiative in the Cement sector, located in Polavaram, Andhra Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

notice to proceed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information Water Resources-AP has come up with Polavaram Irrigation Project with a ticket size of 55548.87 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Polavaram Project is a multi-purpose project which has been accorded National Project status by the Union Government. This project under construction across the Godavari River is located in West Godavari and East Godavari Districts in Andhra Pradesh state and its reservoir spreads in parts of Telangana, Chhattisgarh and Odisha States also. It envisaged to create an irrigation potential of 7.20 lakh Acres for the up land areas of East Godavari & Visakhapatnam Districts under left main canal and West Godavari &Krishna Districts under Right main canal. Main Components of Project and Benefits include - i] 2454 m of Earth cum Rock fill dam/concrete dam in three gaps, ii] 1,118.40 m long spillway for discharging probable maximum flood of 1,41,535 cumec, iii]181.999 km long Left Main Canal to irrigate 4 lakh acres [1,61,855 ha], iv]178.81 km long Right Main Canal to irrigate 3.2 lakh acres [1,29,500 ha] and v] 960 MW [12x80 MW] Power House on left flank with necessary tunnels for penstocks and tail race channel back to river.

Original sector

Water Resources

Procurement method

Budget

Location

Country

India

State

Andhra Pradesh

City

Polavaram

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Cement, Hydro, Tunnel, Water Supply and Storage, Government, Power Generation (CCGT), Road

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project