Polk (BOS) Administration Interior Reconstruction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
General Description: This work consists of furnishing all the necessary equipment, labor, supervision, and necessary permits to for the following services at the Polk Bus Operating Facility Admin. Building located at 5700 Polk St. Houston TX: 1st Floor Scope: 1. Replace existing metal studs on the 1st floor including wood studs that have been damaged by termites. 2. Replace all existing doors with
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Residential, Commercial, Metal, Government
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Polk (BOS) Administration Interior Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | General Description: This work consists of furnishing all the necessary equipment, labor, supervision, and necessary permits to for the following services at the Polk Bus Operating Facility Admin. Building located at 5700 Polk St. Houston TX: 1st Floor Scope: 1. Replace existing metal studs on the 1st floor including wood studs that have been damaged by termites. 2. Replace all existing doors with new ones. 3. Install new ceiling grid and ceiling tiles. 4. Install all electrical and data boxe... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Residential, Commercial, Metal, Government |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
