Polk Street Resurfacing & Sidewalk
Sector: Airport • Location: California, United States of America
Source: Riverside County
Limits: 58th Avenue to Airport Boulevard Length: Approximately 1 mile District: 4 Community: Thermal
The County of Riverside Transportation Department proposes to rehabilitate approximately 1 mile of Polk Street from 58th Avenue to Airport Boulevard. Polk Street is classified as an Arterial Road in the County of Riverside General Plan. Polk Street is a two lane road that varies from 24-53 feet wi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Limits: 58th Avenue to Airport Boulevard Length: Approximately 1 mile District: 4 Community: Thermal The County of Riverside Transportation Department proposes to rehabilitate approximately 1 mile of Polk Street from 58th Avenue to Airport Boulevard. Polk Street is classified as an Arterial Road in the County of Riverside General Plan. Polk Street is a two lane road that varies from 24-53 feet wide with curb/gutter and sidewalk at various segments of the roadway. The proposed improvements consist of pulverizing the roadway width and overlaying the pulverized material with Hot Mix Asphalt (HMA). Additional improvements include: Construction of concrete curb/gutter, sidewalk, driveway approach, and curb ramp Placement of safety edge and shoulder backing Utility adjustments Detector loops Striping of roadway, including pavement markers and reflectors Salvage/removal and installation of new signs No additional right-of-way or temporary construction easements will be required to construct the proposed improvements. The project improvements will raise the existing roadway profile by 0.17 feet. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
