logo
ProjectClosed

Polk Township pavement Replacement

Sector: Steel • Location: Maryville, Missouri, United States of America

Source: Dodge

removal and replacement of17x45x8 entrance and 27x240x8 pavement. Mustsave the existing curb on the west side and tie curb tonew concrete with 5 rebar 4 o.c. Street must be doneone lane at a time to maintain traffic flow.

Status
Closed
Sector
Steel, Road, Government, Cement, Commercial, Manufacturing (Industrial)
Location
Maryville, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Polk Township pavement Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Polk Township pavement Replacement” is an infrastructure initiative in the Steel sector, located in Maryville, Missouri, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

removal and replacement of17x45x8 entrance and 27x240x8 pavement. Mustsave the existing curb on the west side and tie curb tonew concrete with 5 rebar 4 o.c. Street must be doneone lane at a time to maintain traffic flow.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Maryville

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Steel, Road, Government, Cement, Commercial, Manufacturing (Industrial)

Article published date

2025-07-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project