Pollard Road Box Culvert Replacement
Sector: Water Supply and Storage • Location: Ashland, Kentucky, United States of America
Source: Dodge USA
The scope of work is for replacement of one existing box culvert and stormwater junction box and includes: The project involves demolishing and removing the existing box culvert, headwall, and junction chamber located at 1106 Pollard Road, Ashland, Kentucky 41101. This contract will replace the existing structures with a precast concrete box culvert measuring 8 feet wide, 7 feet high, and approxim
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Government, Cement, Waste Processing and Treatment, Road
- Location
- Ashland, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pollard Road Box Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work is for replacement of one existing box culvert and stormwater junction box and includes: The project involves demolishing and removing the existing box culvert, headwall, and junction chamber located at 1106 Pollard Road, Ashland, Kentucky 41101. This contract will replace the existing structures with a precast concrete box culvert measuring 8 feet wide, 7 feet high, and approximately 40 feet long, along with a new junction chamber and headwall structure as depicted in the c... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Ashland |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Cement, Waste Processing and Treatment, Road |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
