Polskie LNG
Sector: Government • Location: Poland
Source: European Bank for Reconstruction and Development (EBRD)
The Loan proceeds will support the Borrower’s expansion of operations at the existing Shalkiya zinc-lead mine located in the Kyzylorda region of Kazakhstan, as well as the construction of a 4 million tonnes per annum processing plant at the site. JSC Shalkiya Zinc LTD (the “Borrower”), a 100% subsidiary of Tau-Ken Samruk (“the Sponsor”), National Mining Company of Kazakhstan. The Sponsor is 100%
- Status
- Closed
- Sector
- Government, LNG, Residential, Commercial
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Polskie LNG
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Loan proceeds will support the Borrower’s expansion of operations at the existing Shalkiya zinc-lead mine located in the Kyzylorda region of Kazakhstan, as well as the construction of a 4 million tonnes per annum processing plant at the site. JSC Shalkiya Zinc LTD (the “Borrower”), a 100% subsidiary of Tau-Ken Samruk (“the Sponsor”), National Mining Company of Kazakhstan. The Sponsor is 100% owned by Samruk-Kazyna National Welfare Fund of Kazakhstan. The key to the successful redevelopment of the mine is a new concentrator which will be constructed on site using modern technology replacing the need to truck ore to the old and more remote Kentau plant (built in 1963). The Project is an integral part of the privatization process for Sponsor declared by the Government of Kazakhstan. According to the law, the Sponsor and the Borrower are included in the list of state assets to be privatised by 2020. The Project will also have gender and inclusion components which among other things will strengthen equal opportunities for women to access employment and skills. This work will be supported through an additional integrated policy dialogue approach to support the Government of Kazakhstan to reduce legal and regulatory barriers and expand legal awareness for women’s equal access to the labour market. The following documents are attached in English and Russian languages Environmental and social management plans Full ESIA availability: Full ESIA documentation is available locally at: 1.Office in Almaty, Kazakhstan: Mrs. Mira Akhmetova – head ecologist; address: 7 Al-Farabi Ave, “Nurly Tau” business – center, Block 4A, 9th floor, office No. 38, 050040, Almaty, Republic of Kazakhstan, phone: +7 727 3 11 06 24; 2.Office in Shalkiya, Kyzylorda region, Kazakhstan: Ms. Akmaral Toltayeva – ecologist, address: office located at the Administrative building of Shalkiya mine, phone: +7 72435 79 1 07 ext. 7082 And EBRD Resident Office. Address 2 Dostyk str, SAAD business center, Astana, 010000 Kazakhstan, Tel. +7 7172 554246 And http://zinc.kz/ESIA Mrs. Mira Akhmetova – head ecologist; address: 7 Al-Farabi Ave, “Nurly Tau” business – center, Block 4A, 9th floor, office No. 38, 050040, Almaty, Republic of Kazakhstan, phone: +7 727 3 11 06 24, email: info@zinc.kz (to the attn. of Mira Akhmetova). |
Original sector | Natural Resources |
Location
Country | Poland |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Government, LNG, Residential, Commercial |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
