Poltava Wind Farm
The owner, status and timeline of this project. A free account opens every field.
Source: The New Voice of Ukraine
A 650 MW wind farm project in Poltava Oblast, Ukraine, funded by the Norwegian Agency for Development Cooperation (Norad). The project aims to decentralize Ukraine's energy system, increase resilience, and integrate with EU energy standards. Construction is expected to be completed in 2028.
- Status
- Prospective
- Sector
- Wind, Raw Materials
- Location
- Poltava Oblast, Ukraine
- Updated
- 22 Jul 2026
- Source
- The New Voice of Ukraine
ConstructChat
Ask ConstructChat about Poltava Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 650 MW wind farm project in Poltava Oblast, Ukraine, funded by the Norwegian Agency for Development Cooperation (Norad). The project aims to decentralize Ukraine's energy system, increase resilience, and integrate with EU energy standards. Construction is expected to be completed in 2028. |
Original sector | Energy |
Budget |
Location
Country | Ukraine |
State | Poltava Oblast |
Source
Source | The New Voice of Ukraine |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials |
Article published date | 2026-04-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
