Pond Maintenance 2025
Closed · Texas · Last reported Jan 2025
Source: Dodge
The Work consists of the removal of all sediment, debris, and unwanted vegetation within the splitter box, sedimentation ponds, and storm outfalls and other maintenance work. Additionally, top six inches of sand filter media is to be removed and restored to the originally designed condition, and underdrain pipes and cleanouts are to be flushed/jetted and cleaned within water quality ponds.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Consumer Products, Waste Processing and Treatment, Commercial
- Location
- Leander, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Pond Maintenance 2025
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work consists of the removal of all sediment, debris, and unwanted vegetation within the splitter box, sedimentation ponds, and storm outfalls and other maintenance work. Additionally, top six inches of sand filter media is to be removed and restored to the originally designed condition, and underdrain pipes and cleanouts are to be flushed/jetted and cleaned within water quality ponds. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Leander |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Consumer Products, Waste Processing and Treatment, Commercial |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
