Pontal 2A Wind Power Plant
Sector: Commercial • Location: Brazil
Source: World Bank Group
The Brazilian company Oleoplan S.A. - Oleos Vegetais Planalto was granted the authorization to build a wind power plant located in the state of Rio Grande do Sul (26.6 MW in total capacity, municipality of Viamao). The sponsor created the company Enerplan Energia Eolica IV S.A. to manage the project
The 35-year contract was signed with the regulatory agency ANEEL in May 2014. The total investment
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Brazilian company Oleoplan S.A. - Oleos Vegetais Planalto was granted the authorization to build a wind power plant located in the state of Rio Grande do Sul (26.6 MW in total capacity, municipality of Viamao). The sponsor created the company Enerplan Energia Eolica IV S.A. to manage the project The 35-year contract was signed with the regulatory agency ANEEL in May 2014. The total investment in the power plants was estimated at US$ 26.3 million (BRL 97.4 million). In January 2016, the state-owned bank BNDES approved a US$ 11.4 million (BRL 42.3 million) loan to the project. The remaining project investment cost was equity financed. The power plant won the public bidding run by the government for the sale of energy to the country´s distribution companies that took place in 2013, by offering a tariff of US$ 34/MWh (BRL 125.9/MWh). The project company signed 20-year power purchase agreements with the several electricity distribution companies, and the agreements included the annual adjustment of the tariff to the inflation rate. Enerplan committed to start supplying the market in 2016. The projects were granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, companies were allowed to use accelerated depreciation methods of accounting for construction expenditures. Finally, the electricity sold were not subject to sectoral taxes. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
