logo

Pontal 2B Wind Power Plant

Sector: Commercial • Location: Rio Grande Do Sul, Brazil

Source: World Bank Group

Project
Active

The company Forca dos Ventos Energia Eolica S.A., a company wholly-owned by the Brazilian company Enerplan Participacao Societaria Ltda (a subsidiary of Oleoplan S.A.), was granted the authorization to build one wind power plant located in the state of Rio Grande do Sul (11.20 MW in total capacity ). The 35-year contract was signed with the regulatory agency ANEEL in March 2011, and the power pla

Status
Prospective
Sector
Commercial, Wind, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial)
Location
Rio Grande Do Sul, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Pontal 2B Wind Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pontal 2B Wind Power Plant” is an infrastructure initiative in the Commercial sector, located in Rio Grande Do Sul, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The company Forca dos Ventos Energia Eolica S.A., a company wholly-owned by the Brazilian company Enerplan Participacao Societaria Ltda (a subsidiary of Oleoplan S.A.), was granted the authorization to build one wind power plant located in the state of Rio Grande do Sul (11.20 MW in total capacity ). The 35-year contract was signed with the regulatory agency ANEEL in March 2011, and the power plant was named EOL Pontal 2B. In August 2010, the wind power plant took part in a competitive bidding process to sell electricity to the regulated wholesale market, starting in 2013 (20-year power purchase agreement was signed guaranteeing the sale of electricity to the national grid). The average tariff offered in the bidding process by the power plants was US$ 68.3/MWh (BRL 134.81/MWh). The total investment in the project was estimated at US$ 18.4 million (BRL 43.2 million). In July 2014, the state-owned bank BNDES approved a US$ 13.7 million (BRL 32.3 million) to the project. As of October 2012, the construction works were underway. Commercial operation was estimated to commence in 2015. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelated depreciation methods of accounting for construction expenditures. In 2011, the company applied for carbon credits.

Original sector

Energy

Budget

Location

Country

Brazil

State

Rio Grande Do Sul

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Wind, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial)

Article published date

2024-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project