The Brazilian company Oleoplan S.A. - Oleos Vegetais Planalto was granted the authorization to build a wind power plant located in the state of Rio Grande do Sul (26.6 MW in total capacity, municipality of Viamao). The sponsor created the company Enerplan Energia Eolica III S.A. to manage the project

The 35-year contract was signed with the regulatory agency ANEEL in June 2012. The total investme

Status
Prospective
Sector
Steel, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Pontal 3B Wind Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pontal 3B Wind Power Plant” is an infrastructure initiative in the Steel sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Oleoplan S.A. - Oleos Vegetais Planalto was granted the authorization to build a wind power plant located in the state of Rio Grande do Sul (26.6 MW in total capacity, municipality of Viamao). The sponsor created the company Enerplan Energia Eolica III S.A. to manage the project The 35-year contract was signed with the regulatory agency ANEEL in June 2012. The total investment in the power plants was estimated at US$ 30.6 million (BRL 102.2 million). In July 2015, the state-owned bank BNDES approved a US$ 19.7 million (BRL 65.7 million) loan to the project. The remaining project investment cost was equity financed. The power plant won the public bidding run by the government for the sale of energy to the country´s distribution companies that took place in 2011, by offering a tariff of US$ 65.6/MWh (BRL 107/MWh). The project company signed 20-year power purchase agreements with the several electricity distribution companies, and the agreements included the annual adjustment of the tariff to the inflation rate. Enerplan committed to start supplying the market in 2016. The projects were granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, companies were allowed to use accelerated depreciation methods of accounting for construction expenditures. Finally, the electricity sold were not subject to sectoral taxes. Construction works commenced in March 2015 and were underway as of December 2015. Contract available at: http://biblioteca.aneel.gov.br/index.asp?busca=legislacao_avancada

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Steel, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project