Pontianak Power Plant
Sector: Commercial • Location: West Java, Indonesia
Source: World Bank Group
PT Equator Manuggal Power (EMP), a wholly-owned subsidiary of private company PT Truba Alam Manunggal Engineering Tbk, was to develop the 60 MW (2 x 30 MW units), coal-fired Pontianak Power Plant on a build, own and operate basis near Pontianak in West Kalimantan province. PT EMP was to sell electricity generated by the plant to state-owned electricity utility, PT Perusahaan Listrik Negara (PLN),
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Power Transmission, Government
- Location
- West Java, Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Pontianak Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PT Equator Manuggal Power (EMP), a wholly-owned subsidiary of private company PT Truba Alam Manunggal Engineering Tbk, was to develop the 60 MW (2 x 30 MW units), coal-fired Pontianak Power Plant on a build, own and operate basis near Pontianak in West Kalimantan province. PT EMP was to sell electricity generated by the plant to state-owned electricity utility, PT Perusahaan Listrik Negara (PLN), under a 25-year power purchase agreement (PPA) signed in March 2007. The coal-fired power plant was intended to address an electricity shortage in West Kalimantan province, especially in Pontianak. On March 25, 2008, Bank Bukopin together with four regional development banks - Bank Jatim, Bank DKI, BPD Kaltim, and BPD Kalbar -arranged a syndicated loan to PT Equator Manunggal Power for the construction of the Pontianak Power Plant. Total funds from the bank syndication were US$37.6 million (365 billion Indonesian Rupiah [IDR]), out of the US$56.2 million (IDR 545 billion) total project cost. Bank Bukopin, as mandated lead arranger of the syndicate, funded US$13.9 million (IDR 135 billion), while Bank Jatim funded US$ 10.3 million (IDR 100 billion), Bank DKI US$7.7 million (IDR 75 billion), BPD Kaltim US$4.6 million (IDR 45 billion), and BPD Kalbar US$1 million (IDR 10 billion). The ground-breaking of the project occurred in November 2007 and the plant was expected to commence commercial operations in mid-2010. |
Original sector | Energy |
Budget |
Location
Country | Indonesia |
State | West Java |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Power Transmission, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
