Pooler Parkway / Pine Barren Intersection Project
Sector: Water Supply and Storage • Location: Pooler, Georgia, United States of America
Source: Dodge
The work will include all equipment, materials, supplies, labor, and all other costs associated with construction of approximately 3,200 linear feet of roadway. The roadway includes the modification of a signalized intersection, sidewalks, multi-use trail, drainage improvements, installation and maintenance of erosion, sediment and pollution control BMPs and final site stabilization.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Car parking, Automotive, Road, Commercial
- Location
- Pooler, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Pooler Parkway / Pine Barren Intersection Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work will include all equipment, materials, supplies, labor, and all other costs associated with construction of approximately 3,200 linear feet of roadway. The roadway includes the modification of a signalized intersection, sidewalks, multi-use trail, drainage improvements, installation and maintenance of erosion, sediment and pollution control BMPs and final site stabilization. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Pooler |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Car parking, Automotive, Road, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
