logo
ProjectBidding

Poplar St. Bridge Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Bridge, Paving. Bids to Owner Public - Local November 30 at 02:00 PM (CST)

Status
Prospective
Sector
Bridge, Chemical (Industrial), Water Supply and Storage, Steel, Metal, Power Transmission, Commercial, Warehouse, Manufacturing (Industrial), Cement, Rail, Road, Power Generation (CCGT), Telecommunications, Government
Location
Oberlin, Louisiana, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Poplar St. Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Poplar St. Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Oberlin, Louisiana, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Bridge, Paving. Bids to Owner Public - Local November 30 at 02:00 PM (CST)

Original sector

Transport

Budget

Location

Country

United States of America (USA)

State

Louisiana

City

Oberlin

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Bridge, Chemical (Industrial), Water Supply and Storage, Steel, Metal, Power Transmission, Commercial, Warehouse, Manufacturing (Industrial), Cement, Rail, Road, Power Generation (CCGT), Telecommunications, Government

Article published date

2026-11-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project