Port Acu Solar PV Plant
One of 733 projects Taiyo tracks in Rio Grande Do Norte.
Source: World Bank Group
The proceeds will be used for the construction of a solar PV plant in the port of Acu in Brazil. The $1 billion project will be built in two stages – a first 300MW phase and a second 800MW phase. China Development Integration (CDIL) will develop the asset through a special purpose vehicle controlled by its subsidiary, China-Brazil Integration Group. CDIL has tapped China Machinery Engineering Corp
- Status
- Prospective
- Sector
- Automotive, Power Generation (CCGT), Seaport, Solar, Government, Commercial
- Location
- Rio Grande Do Norte, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Port Acu Solar PV Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proceeds will be used for the construction of a solar PV plant in the port of Acu in Brazil. The $1 billion project will be built in two stages – a first 300MW phase and a second 800MW phase. China Development Integration (CDIL) will develop the asset through a special purpose vehicle controlled by its subsidiary, China-Brazil Integration Group. CDIL has tapped China Machinery Engineering Corp (CMEC) for the engineering, procurement and construction of the project, as well as the financing. Total project cost is 1000 USDm and it was provided in equity. Financial Closure was achieved in April 2021. Once operational, the solar facility will be one of the largest renewable energy assets in the region, said the consortium in a statement. https://ijglobal.com/articles/154986/chinese-duo-to-develop-11-gw-of-brazilian-solar https://ijglobal.com/data/transaction/55861?name=Port%20Acu%20Solar%20PV%20Plant%20(1.1GW)&link=%2Farticles%2F154986%2Fchinese-duo-to-develop-11-gw-of-brazilian-solar |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Rio Grande Do Norte |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Automotive, Power Generation (CCGT), Seaport, Solar, Government, Commercial |
Article published date | 2024-05-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
