logo

Port Alberni - Connect the Quays Multi-Modal Pathway

Sector: Water Supply and Storage • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Completed

The project will construct a new, approximately 3.5-kilometre multi-modal asphalt pathway connecting the Victoria Quay on the Stamp River estuary near the north-western boundary of the City to Harbour Quay in the centre of Port Alberni. The pathway will promote recreation and active transportation. The development of a new, connected, multi-use waterfront pathway has been a community vision for ov

Status
Closed
Sector
Water Supply and Storage, Cement, Seaport, Bridge, Car parking, Road, Automotive
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Port Alberni - Connect the Quays Multi-Modal Pathway

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Port Alberni - Connect the Quays Multi-Modal Pathway” is an infrastructure initiative in the Water Supply and Storage sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will construct a new, approximately 3.5-kilometre multi-modal asphalt pathway connecting the Victoria Quay on the Stamp River estuary near the north-western boundary of the City to Harbour Quay in the centre of Port Alberni. The pathway will promote recreation and active transportation. The development of a new, connected, multi-use waterfront pathway has been a community vision for over thirty years, first recommended in the 1991 Shoreline Master Plan and then reinforced in the 2000 Shoreline Master Plan Review. It is now Council’s highest priority as identified in the 2019-2023 Corporate Strategic Plan because demand for safe, accessible, multi-use recreational amenities is very high. The only other multi-modal pathway in the community is a 6.3-kilometre loop that runs up and then down the sides of a creek. Its accessibility drops heavily in the months between October and March because of safety concerns. The project works will include: - removal of existing curb and gutter; - concrete sidewalk; - asphalt pathway; - letdowns, curb, and gutter; - multi-modal bridge over Dry Creek; - pedestrian-activated crossing signals; - trail signages; - LED lightings; - lookout area, benches, railside barriers; - landscaping and irrigation; and - other related works.

Original sector

Active Transportation

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Seaport, Bridge, Car parking, Road, Automotive

Article published date

2026-04-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project