Port Angeles Wastewater Treatment Plant Boiler Replacement
Sector: Water Supply and Storage • Location: Port Angeles, Washington, United States of America
Source: Dodge USA
The existing boiler at the Wastewater Treatment Plant is 22 years old and requires regular, costly maintenance. The project will replace the boiler with a smaller, more efficient boiler to be located at a different site. This will require changes to the steam lines to the digesters and will result in lower energy losses in the steam conveyance system.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The existing boiler at the Wastewater Treatment Plant is 22 years old and requires regular, costly maintenance. The project will replace the boiler with a smaller, more efficient boiler to be located at a different site. This will require changes to the steam lines to the digesters and will result in lower energy losses in the steam conveyance system. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
