logo

Port au Bras - Water System Improvements

Sector: Waste Processing and Treatment • Location: Newfoundland and Labrador, Canada

Source: Infrastructure Canada

Project
Completed

Project consists of improvements made to the Port au Bras chlorination treatment system in the town of Burin. The scope of this project includes the supply and commissioning of a new full disinfection system, the installation and commissioning of a new fully functional booster pump system, full mechanical and electrical works will be provided for both, a dive inspection of the existing intake scre

Status
Closed
Sector
Waste Processing and Treatment, Water Supply and Storage, Commercial
Location
Newfoundland and Labrador, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Port au Bras - Water System Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Port au Bras - Water System Improvements” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Newfoundland and Labrador, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project consists of improvements made to the Port au Bras chlorination treatment system in the town of Burin. The scope of this project includes the supply and commissioning of a new full disinfection system, the installation and commissioning of a new fully functional booster pump system, full mechanical and electrical works will be provided for both, a dive inspection of the existing intake screen shall be completed and a full SCADA connection network to both the chlorination system and booster pump system. Building repairs are also included to both buildings. The project aims to improve the water quality coming from the Port au Bras treatment facility throughout the Town of Burin. The project will provide an upgraded water chlorination system for Port au Bras to ensure safe drinking water for the town and reduce required maintenance from town forces.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Newfoundland and Labrador

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Commercial

Article published date

2026-06-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project