Port Augusta Solar Thermal Feasibility Study
Sector: Commercial • Location: Australia
Source: Australian Renewable Energy Agency (ARENA)
This project focused on the pre-feasibility work needed to assess the viability of a stand-alone solar thermal plant using ‘power tower’ technology that would see a field of mirrors concentrate light into a central receiver at the top of a tower. The high temperatures generated by power tower technology make it most compatible with molten-salt storage.It was ultimately determined that the proposed
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project focused on the pre-feasibility work needed to assess the viability of a stand-alone solar thermal plant using ‘power tower’ technology that would see a field of mirrors concentrate light into a central receiver at the top of a tower. The high temperatures generated by power tower technology make it most compatible with molten-salt storage.It was ultimately determined that the proposed project would not be commercially viable. In late 2011 Alinta Energy began to assess potential solar thermal opportunities in regional South Australia (SA). Its Solar Concept Study concluded that SA is a high-quality location for solar thermal energy, and that stand-alone concentrated solar power could be feasible.Alinta then commissioned Parsons Brinckerhoff in 2014 to examine the available solar thermal technologies and potential locations for a solar thermal power plant in SA. The consultants found that a 50MW solar thermal plant near Port Augusta’s existing power stations was technically feasible. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
