Port Clements - Wastewater System Upgrading
One of 10,000+ projects Taiyo tracks in British Columbia.
Source: Infrastructure Canada
The proposed project will improve wastewater treatment by constructing a new aerated wastewater treatment lagoon system to replace the Village’s existing wastewater lagoon. The wastewater treatment system is out of compliance with both provincial and federal requirements. This project will bring the system into compliance with the Municipal Wastewater Regulation and the Wastewater Systems Effluent
- Status
- Under Construction
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Power Generation (CCGT)
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Port Clements - Wastewater System Upgrading
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will improve wastewater treatment by constructing a new aerated wastewater treatment lagoon system to replace the Village’s existing wastewater lagoon. The wastewater treatment system is out of compliance with both provincial and federal requirements. This project will bring the system into compliance with the Municipal Wastewater Regulation and the Wastewater Systems Effluent Regulations. The project works will include: - A multi-cell lagoon system that increases overall retention time, provides separate cells for aeration, settling and for polishing, and that limits short-circuiting. - A floating aeration system capable of providing dissolved oxygen content appropriate for the design flow. - A rock filter consisting of a separate cell partition filled with rounded stone. - A floating cover over the settling cell to prevent light penetration that is conducive to algae growth. - A lagoon system was selected to both minimize operational effort and power consumption and to maximize life span. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Power Generation (CCGT) |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
