PORT DEVELOPMENT
Sector: Road • Location: Papua New Guinea
Source: World Bank Group
The project consists of the following main items: (i) at Port Moresby, land reclamation, a storage shed and a stacking area. The additional open and covered storage space is needed to solve present and expected storage problems; (ii) in Lae, a deep-water berth designed to accommodate container traffic would be constructed as an extension of an existing wharf. As a result of the construction of the
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Seaport, Government
- Location
- Papua New Guinea
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about PORT DEVELOPMENT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the following main items: (i) at Port Moresby, land reclamation, a storage shed and a stacking area. The additional open and covered storage space is needed to solve present and expected storage problems; (ii) in Lae, a deep-water berth designed to accommodate container traffic would be constructed as an extension of an existing wharf. As a result of the construction of the Lae-Highlands Highway, traffic through the port has been increasing at an average of 17 percent annually for the last three years and a three-shift operation has been introduced to decrease ship delays. As previously explained, expansion in excess of the proposed works depends on construction of a road from Madang to the Highlands; (iii) coaster berth of facilitation will be added at the port of Kieta, to free the existing deep-water berth for overseas shipping and avoid current delays; (iv) the existing port at Samarai is old and unsafe for heavier loads, causing overseas lines to bypass the port. A small new port at Alotau, to cost US$1.3 million, will serve the Milne Bay District better; (v) the association would also finance cargo-handling equipment and would provide for training and management consultant services as well as the cost of engineering consultants. |
Original sector | Transportation |
Location
Country | Papua New Guinea |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Seaport, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
