logo

PORT DEVELOPMENT

Sector: Road • Location: Papua New Guinea

Source: World Bank Group

Project
Closed

The project consists of the following main items: (i) at Port Moresby, land reclamation, a storage shed and a stacking area. The additional open and covered storage space is needed to solve present and expected storage problems; (ii) in Lae, a deep-water berth designed to accommodate container traffic would be constructed as an extension of an existing wharf. As a result of the construction of the

Status
Closed
Sector
Road, Water Supply and Storage, Seaport, Government
Location
Papua New Guinea
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about PORT DEVELOPMENT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “PORT DEVELOPMENT” is an infrastructure initiative in the Road sector, located in Papua New Guinea. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the following main items: (i) at Port Moresby, land reclamation, a storage shed and a stacking area. The additional open and covered storage space is needed to solve present and expected storage problems; (ii) in Lae, a deep-water berth designed to accommodate container traffic would be constructed as an extension of an existing wharf. As a result of the construction of the Lae-Highlands Highway, traffic through the port has been increasing at an average of 17 percent annually for the last three years and a three-shift operation has been introduced to decrease ship delays. As previously explained, expansion in excess of the proposed works depends on construction of a road from Madang to the Highlands; (iii) coaster berth of facilitation will be added at the port of Kieta, to free the existing deep-water berth for overseas shipping and avoid current delays; (iv) the existing port at Samarai is old and unsafe for heavier loads, causing overseas lines to bypass the port. A small new port at Alotau, to cost US$1.3 million, will serve the Milne Bay District better; (v) the association would also finance cargo-handling equipment and would provide for training and management consultant services as well as the cost of engineering consultants.

Original sector

Transportation

Location

Country

Papua New Guinea

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Seaport, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project