logo

Port Dickson Power Bhd.

Sector: Wind • Location: Negeri Sembilan, Malaysia

Source: World Bank Group

Project
Active

Port Dickson Power Bhd., had developed a 440MW (4x110MW) peak plant at Port Dickson, Tanjung Gernok, Negri Semilban State. Power Dickson Power Bhd. was a consortium of Sime Darby Bhd (40%), Malaysian Resources Corp. Bhd. (MRCB) (20%), Malakoff Bhd wholly-owned subsidary Hypergantic Sdn. Bhd. (20%), and Tenaga Nasional Bhd (TNB) (20%). In February 2000, Sime Darby Bhd. acquired Malaysian Resources'

Status
Prospective
Sector
Wind, Power Generation (CCGT), Seaport, Natural Gas, Commercial, Government, Manufacturing (Industrial)
Location
Negeri Sembilan, Malaysia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Port Dickson Power Bhd.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Port Dickson Power Bhd.” is an infrastructure initiative in the Wind sector, located in Negeri Sembilan, Malaysia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Port Dickson Power Bhd., had developed a 440MW (4x110MW) peak plant at Port Dickson, Tanjung Gernok, Negri Semilban State. Power Dickson Power Bhd. was a consortium of Sime Darby Bhd (40%), Malaysian Resources Corp. Bhd. (MRCB) (20%), Malakoff Bhd wholly-owned subsidary Hypergantic Sdn. Bhd. (20%), and Tenaga Nasional Bhd (TNB) (20%). In February 2000, Sime Darby Bhd. acquired Malaysian Resources' 20% stake in the project and in February 2004, it acquired 15% from TNB for 105.5 million ringgit. Hypergantic Bhd. acquired the remaining 5% stake from TNB for 34.5 million ringgit. The project company was awarded an IPP license in April 1993; construction began in Dec. 1993; and the plant became operational in April 1995. A 21-year PPA that includes fixed and variable charges and fuel pass-through provisons was signed with Tenaga (TNB). A fuel supply agreement was signed with Petronas. The project company has announced plans to convert the open-cycle gas turbine into a combined-cycle facility with an additional capacity of 220-MW.

Original sector

Energy

Budget

Location

Country

Malaysia

State

Negeri Sembilan

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT), Seaport, Natural Gas, Commercial, Government, Manufacturing (Industrial)

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project