logo

Port Dickson Power Bhd.

Sector: Wind • Location: Malaysia

Source: World Bank Group

Project
Active

Port Dickson Power Bhd., had developed a 440MW (4x110MW) peak plant at Port Dickson, Tanjung Gernok, Negri Semilban State. Power Dickson Power Bhd. was a consortium of Sime Darby Bhd (40%), Malaysian Resources Corp. Bhd. (MRCB) (20%), Malakoff Bhd wholly-owned subsidary Hypergantic Sdn. Bhd. (20%), and Tenaga Nasional Bhd (TNB) (20%). In February 2000, Sime Darby Bhd. acquired Malaysian Resources'

Project Information FAQ

Project Information

4 Q
The project “Port Dickson Power Bhd.” is an infrastructure initiative in the Wind sector, located in Malaysia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Port Dickson Power Bhd., had developed a 440MW (4x110MW) peak plant at Port Dickson, Tanjung Gernok, Negri Semilban State. Power Dickson Power Bhd. was a consortium of Sime Darby Bhd (40%), Malaysian Resources Corp. Bhd. (MRCB) (20%), Malakoff Bhd wholly-owned subsidary Hypergantic Sdn. Bhd. (20%), and Tenaga Nasional Bhd (TNB) (20%). In February 2000, Sime Darby Bhd. acquired Malaysian Resources' 20% stake in the project and in February 2004, it acquired 15% from TNB for 105.5 million ringgit. Hypergantic Bhd. acquired the remaining 5% stake from TNB for 34.5 million ringgit. The project company was awarded an IPP license in April 1993; construction began in Dec. 1993; and the plant became operational in April 1995. A 21-year PPA that includes fixed and variable charges and fuel pass-through provisons was signed with Tenaga (TNB). A fuel supply agreement was signed with Petronas. The project company has announced plans to convert the open-cycle gas turbine into a combined-cycle facility with an additional capacity of 220-MW.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data