PORT I
Closed · Cameroon
Source: World Bank Group
The project consists of the following: (a) the construction of a new deep-water quay, approximately 200 meters long and 8.5 meters deep; (b) the construction of a shallow-draft quay and of sloping concrete aprons; the paving of 20,000 square meters of roads and timber-stacking areas; and the shifting of an existing 20-ton overhead crane to the edge of the new shallow-draft quay; (c) dredging of ap
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Seaport, Forest Products and Packaging, Cement, Government
- Location
- Cameroon
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about PORT I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the following: (a) the construction of a new deep-water quay, approximately 200 meters long and 8.5 meters deep; (b) the construction of a shallow-draft quay and of sloping concrete aprons; the paving of 20,000 square meters of roads and timber-stacking areas; and the shifting of an existing 20-ton overhead crane to the edge of the new shallow-draft quay; (c) dredging of approximately 100,000 cubic meters in front of the log-handling area to facilitate movement of barges and floating logs; (d) acquisition of a small suction-cutter dredger to carry out dredging work and to maintain attained depths; (e) installation of buoys to form three mooring stations for timber-loading ships; (f) acquisition of mobile and floating log-handling equipment; (g) a feasibility study of alternative schemes for timber handling; (h) elaboration of a modern, accrual-basis accounting system for the port of Douala-Bonaberi, and preparation of an inventory of its assets. |
Original sector | Transportation |
Location
Country | Cameroon |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Seaport, Forest Products and Packaging, Cement, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Cameroon
- PROJET DE PRODUCTION DES PROVENDERIES, POULETS, PORCS POUR ABATTAGE.
- Cameroon - Yaounde Sanitation Project – Phase II (PADY.2)
- Cameroon - Lom-Pangar Hydroelectric Project
- Mise en place d'un projet de production de produits à base de banane plantain
- Cameroon - Agricultural Value Chain Development Project
- Cameroon - Project to Develop Access Roads to The Industrial and Port Area of Kribi (PARZIK)
- PROJET DE CONSTRUCTION D'UNE UNITE DE PRODUCTION DES BLOCS DE BETON ET ASSIMILES
- Palm Oil Production
