logo

PORT III

Sector: Warehouse • Location: Honduras

Source: World Bank Group

Project
Closed

The proposed project contains the following components: (a) Civil Works: at Puerto Castilla: construction of a 450 m wharf, one transit shed, one warehouse, two lumber sheds, storage tanks for palm oil and petroleum, office building, and miscellaneous services. At San Lorenzo: extension of the pier (presently under construction) to provide an additional berth 145 m long, and construction of a suga

Project Information FAQ

Project Information

5 Q
The project “PORT III” is an infrastructure initiative in the Warehouse sector, located in Honduras. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project contains the following components: (a) Civil Works: at Puerto Castilla: construction of a 450 m wharf, one transit shed, one warehouse, two lumber sheds, storage tanks for palm oil and petroleum, office building, and miscellaneous services. At San Lorenzo: extension of the pier (presently under construction) to provide an additional berth 145 m long, and construction of a sugar storage shed and two molasses tanks. (b) Equipment: at Puerto Castilla: provision of general cargo and lumber handling equipment, chip-loading equipment, a used tugboat and a launch. At San Lorenzo: provision of (1) equipment for handling sugar, lumber and general cargo and for pumping molasses; and (2) navigational aids. (c) Consultant services for detailed engineering and supervision of construction; and (d) technical assistance for (i) channel depth study at San Lorenzo; and (ii) training of ENP staff in container operations at Puerto Cortes.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data