logo

Port Mohammed bin Qasim Liquid Bulk Terminal

Sector: Chemical (Industrial) • Location: Pakistan

Source: World Bank Group

Project
Active

Engro Vopak Terminal Limited (EVTL) was established as a 50/50 joint venture between Engro Chemical Pakistan Limited and Royal Vopak NV. EVTL set up Pakistan's first dedicated liquid chemical Jetty Terminal at Port Qasim in 1995.

Royal Vopak NV participated in the joint venture as Paktank Asia Pacific BV until 1999, when Royal Pakhoed NV - the parent company of Paktank Asia Pacific BV - merged

Project Information FAQ

Project Information

4 Q
The project “Port Mohammed bin Qasim Liquid Bulk Terminal” is an infrastructure initiative in the Chemical (Industrial) sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Engro Vopak Terminal Limited (EVTL) was established as a 50/50 joint venture between Engro Chemical Pakistan Limited and Royal Vopak NV. EVTL set up Pakistan's first dedicated liquid chemical Jetty Terminal at Port Qasim in 1995. Royal Vopak NV participated in the joint venture as Paktank Asia Pacific BV until 1999, when Royal Pakhoed NV - the parent company of Paktank Asia Pacific BV - merged with Royal Van Ommeren NV to form Royal Vopak NV. As a result of the merger, Engro Paktank Terminal (EPTL) changed its name to Engro Vopak Terminal Limited (EVTL). The IFC contributed a total of US$17 million in loans to EVTL in 1996. Operations commenced in December, 1997. On May 2nd, 1998 the new bulk liquid chemical terminal was officially inaugurated. The total cost of the first phase of the project was US$65 million. An additional implementation agreement was signed between Port Qasim Authority and EPTL in June 1998, allowing EPTL to build and operate an LPG facility at their existing Terminal at Port Qasim. http://www.engro.com/html/engro_paktank_terminal_limited.html None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data